Power plant · England, United Kingdom

Race Bank (Phase 1)

Race Bank (Phase 1) is a power plant in England, United Kingdom, with 290 MW of capacity, operated by Macquarie Group and Orsted.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressRace Bank Greater WashDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2017DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOffshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date6 Jul 2012 (Electricity Act 1989 section 36, issued by DECC (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date23 Jan 2009 (planning authority DECC (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date6 Jul 2012 (granted, planning authority DECC (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorMacquarie Group (Orsted (formerly Dong Energy)/ Macquarie Group)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorOrsted (Orsted (formerly Dong Energy)/ Macquarie Group)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity290 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units46 units (6.3 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OffshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.1367, 0.5927DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Race Bank (Phase 1) is the 44th-largest of 3,430 power plants in England and the 63rd-largest of 5,050 in the United Kingdom by capacity; its 290 MW is 0.25% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England44th of 3,43071,985 MW0.4%
United Kingdom63rd of 5,050115,642 MW0.25%
All power plants in our data995th of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Electricity Act 1989 section 36)
  2. Started operating

Nearby

Within 50 km of this power plant: 39 grid connections (4 operating, 49.5 MW), 4 transmission lines and 4 substations, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Ingoldmills Sewage Works grid connectionGrid connection——18 km
Skegness Burgh Road West PE24 4UF grid connectionGrid connection——19 km
Wind 97.2 MW grid connectionGrid connection——20 km
Ossian Transmission InfrastructureTransmission line—Cancelled24 km
Grimsby to WalpoleTransmission line—Planned33 km
South RestonSubstation——38 km
Keddington RoadSubstation——47 km
GrainthorpeSubstation——47 km
Kings Lynn B Connection ProjectTransmission line—Permitted48 km

Operators and place

More from Macquarie Group

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page