Power plant · Buckinghamshire, England, United Kingdom

Quarrendon Fields

Quarrendon Fields is a power plant in Buckinghamshire, England, United Kingdom, with 1.5 MW of capacity, operated by AWE Renewables.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBuckinghamshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressQuarrendon Fields, Aylesbury, HP18 0PTDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2014DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date19 Mar 2012 (permit 10/00136/APP, Town and Country Planning Act, issued by Buckinghamshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date15 Feb 2010 (reference 10/00136/APP, planning authority Buckinghamshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Mar 2012 (appeal granted, reference 10/00136/APP, planning authority Buckinghamshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Mar 2012 (granted, reference 10/00136/APP, planning authority Buckinghamshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorAWE RenewablesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units1 units (1.5 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.8428, -0.8329DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (appeal granted, planning authority Buckinghamshire, reference 10/00136/APP)
  3. Permit granted (planning authority Buckinghamshire, reference 10/00136/APP)
  4. Permit applied for (planning authority Buckinghamshire, reference 10/00136/APP)

How it compares

Quarrendon Fields is the 3,048th-largest of 3,430 power plants in England and the 4,531st-largest of 5,050 in the United Kingdom by capacity; its 1.5 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,048th of 3,43071,965 MW<0.1%
United Kingdom4,531st of 5,050115,622 MW<0.1%
All power plants in our data11,084th of 12,0321,190,447 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 142 substations, 120 grid connections (56 operating, 616 MW) and 82 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Data center, England (OSM way 1254986167)Data center——5.1 km
East Claydon GSPSubstation——11 km
Bicester 49.9MW - PV grid connectionGrid connection44 MWPlanned18 km
Pembridge Farm grid connectionGrid connection131 MWPlanned18 km
Data center, England (OSM way 1460602301)Data center—Under construction18 km
Rycote Farm grid connectionGrid connection47.5 MWPlanned18 km
Arncott PrimarySubstation——20 km
Bicester North BSPSubstation——22 km
nLighten Milton KeynesData center——22 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom