Power plant · East Staffordshire, England, United Kingdom

Pirelli Limited, Derby Road - Solar Panels

Pirelli Limited, Derby Road - Solar Panels is a cancelled solar power plant in East Staffordshire, England, United Kingdom, with 1.29 MW of capacity, operated by Pirelli Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEast Staffordshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressPirelli Limited, Derby Road, Stretton, Burton on Trent, DE13 0BHDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission granted, permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date5 Apr 2024 (permit P/2024/00218, Town and Country Planning Act, issued by East Staffordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date6 Mar 2024 (reference P/2024/00218, planning authority East Staffordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date5 Apr 2024 (granted, reference P/2024/00218, planning authority East Staffordshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPirelli Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.29 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.8270, -1.6204DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority East Staffordshire, reference P/2024/00218)
  2. Permit applied for (planning authority East Staffordshire, reference P/2024/00218)

How it compares

Pirelli Limited, Derby Road - Solar Panels is the 3,765th-largest of 4,036 power plants in England and the 5,482nd-largest of 5,837 in the United Kingdom by capacity; its 1.29 MW is <0.1% of the 200,833 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,765th of 4,036134,406 MW<0.1%
United Kingdom5,482nd of 5,837200,833 MW<0.1%
All power plants in our data12,398th of 13,0281,354,089 MW<0.1%

Nearby

Within 50 km of this power plant: 8 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.

NameKindSizeStatusDistance
Chesterfield to WillingtonTransmission line—Planned26 km
ExperianData center——32 km
nLighten NottinghamData center——34 km
Data center, England (OSM way 710050084)Data center——36 km
Weston Marsh to East LeicestershireTransmission line—Planned45 km