Power plant · Swindon, England, United Kingdom

Pentylands Farm

Pentylands Farm is a solar power plant in Swindon, England, United Kingdom, with 19 MW of capacity, operated by Moser Baer.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSwindon (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressPentylands Lane, Highworth, Swindon, Wiltshire, SN6 7RBDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2014DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date15 Nov 2012 (permit S/12/1094, Town and Country Planning Act, issued by Swindon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date8 Aug 2012 (reference S/12/1094, planning authority Swindon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date15 Nov 2012 (granted, reference S/12/1094, planning authority Swindon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorMoser BaerDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity19 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area35.9 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.6534, -1.7276DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Swindon, reference S/12/1094)
  3. Permit applied for (planning authority Swindon, reference S/12/1094)

How it compares

Pentylands Farm is the 971st-largest of 4,035 power plants in England and the 1,624th-largest of 5,834 in the United Kingdom by capacity; its 19 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England971st of 4,035134,434 MW<0.1%
United Kingdom1,624th of 5,834200,500 MW<0.1%
All power plants in our data7,055th of 15,7991,918,113 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 194 grid connections (105 operating, 1,265 MW), 131 substations and 10 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Pentylands Farm grid connectionGrid connection14.3 MWOperating0.7 km
Lynt Farm PV grid connectionGrid connection21.5 MWOperating2.2 km
Stanton Waters PV grid connectionGrid connection3.8 MWOperating3.8 km
Stanton Fitzwarren PrimarySubstation——4.2 km
nLighten SwindonData center——5.7 km
Lechlade PrimarySubstation——6.3 km
Stratton PrimarySubstation——6.4 km
Nationwide Swindon Technology CentreData center——12 km
VodafoneData center——14 km

Operator and place

Grid connections attached to this power plant

More from Moser Baer

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page