Power plant · East Devon, England, United Kingdom

Paytherden Solar Farm (Peradon)

Paytherden Solar Farm (Peradon) is a power plant under construction in East Devon, England, United Kingdom, with 49 MW of capacity, operated by Lightrock Power.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEast Devon (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressAdj Peradon Farm, Clyst Hydon, Cullompton, EX15 2NGDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date7 Dec 2022 (permit 21/3120/MFUL, Town and Country Planning Act, issued by East Devon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date14 Dec 2021 (reference 21/3120/MFUL, planning authority East Devon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date7 Dec 2022 (granted, reference 21/3120/MFUL, planning authority East Devon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLightrock PowerDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area70.4 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.8058, -3.3391DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Paytherden Solar Farm (Peradon) is the 782nd-largest of 2,174 power plants planned, permitted or under construction in England and the 1,243rd-largest of 3,222 in the United Kingdom by capacity; its 49 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England782nd of 2,174186,088 MW<0.1%
United Kingdom1,243rd of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data2,326th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 189 grid connections (2 operating, 31.8 MW) and 1 substation, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
Peradon Farm grid connectionGrid connection——0.5 km
Peradon Solar & Storage grid connectionGrid connection——0.5 km
CLYST St Lawrence Energy Storage grid connectionGrid connection——1.7 km
Axminster GSPSubstation——29 km