Power plant · Brighton and Hove, England, United Kingdom

ParkerSteel Shoreham Plant

ParkerSteel Shoreham Plant is a power plant in Brighton and Hove, England, United Kingdom, with 1.8 MW of capacity, operated by Larimin.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBrighton and Hove (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressParker Steel Ltd, Fishgate Terminal, Basin Road South, Portslade, BN41 1WFDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2015DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date20 Mar 2015 (Town and Country Planning Act, issued by Brighton and Hove)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date5 Mar 2015 (planning authority Brighton and Hove)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date20 Mar 2015 (granted, planning authority Brighton and Hove)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLariminDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.8 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.8283, -0.2121DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Brighton and Hove)
  3. Permit applied for (planning authority Brighton and Hove)

How it compares

ParkerSteel Shoreham Plant is the 2,958th-largest of 3,430 power plants in England and the 4,399th-largest of 5,050 in the United Kingdom by capacity; its 1.8 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,958th of 3,43071,965 MW<0.1%
United Kingdom4,399th of 5,050115,622 MW<0.1%
All power plants in our data10,776th of 12,0321,190,447 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 36 grid connections (25 operating, 133 MW), 22 substations and 10 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
IBM HorshamData center——24 km
Binsted Farm PV grid connectionGrid connection3.98 MWOperating28 km
Billingshurst PrimarySubstation——28 km
Binstead Farm grid connectionGrid connection12.2 MWPlanned28 km
Solar 3.905 MW grid connection at Five Oaks Farm PVGrid connection3.91 MWOperating29 km
Bilsham PrimarySubstation——29 km
Five Oaks PrimarySubstation——29 km
Digital Realty LGW15Data center——33 km
Digital Realty LGW16Data center——34 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page