Power plant · Westmorland and Furness, England, United Kingdom

Omega Proteins - Solar Farm & Battery Storage

Omega Proteins - Solar Farm & Battery Storage is a cancelled solar power plant in Westmorland and Furness, England, United Kingdom, with 2.5 MW of capacity, operated by Leo Group Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWestmorland and Furness (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressOmega Proteins, Penrith, CA11 0BXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission granted, permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date19 May 2023 (permit 21/0752, Town and Country Planning Act, issued by Westmorland and Furness)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date16 Aug 2021 (reference 21/0752, planning authority Westmorland and Furness)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 May 2023 (granted, reference 21/0752, planning authority Westmorland and Furness)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLeo Group Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity2.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area10 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.6606, -2.7774DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Westmorland and Furness, reference 21/0752)
  2. Permit applied for (planning authority Westmorland and Furness, reference 21/0752)

How it compares

Omega Proteins - Solar Farm & Battery Storage is the 3,153rd-largest of 4,035 power plants in England and the 4,572nd-largest of 5,834 in the United Kingdom by capacity; its 2.5 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,153rd of 4,035134,434 MW<0.1%
United Kingdom4,572nd of 5,834200,500 MW<0.1%
All power plants in our data13,634th of 15,8001,923,633 MW<0.1%

Nearby

Within 50 km of this power plant: 97 grid connections (48 operating, 316 MW) and 54 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Newtongate T11 & T12Substation——0.7 km
Newtongate T13Substation——0.7 km
Charnock Richard Solar Farm grid connectionGrid connection12 MWPlanned0.8 km
Penrith & Shap BSPSubstation——0.8 km
Land North East of Newton Road grid connectionGrid connection30 MWPlanned0.8 km
Penrith BESS grid connectionGrid connection49.9 MWPlanned0.8 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page