Power plant · North Warwickshire, England, United Kingdom

Nuneaton Animal Waste Incinerator Power Station

Nuneaton Animal Waste Incinerator Power Station is a cancelled biomass power plant in North Warwickshire, England, United Kingdom, with 5 MW of capacity, operated by DeMulder and Sons Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Warwickshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressMancetter Road/Grange Road, CV10 0TADESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (abandoned)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date3 Jun 2003 (permit MIN/2002/0028, Town and Country Planning Act, issued by North Warwickshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date24 Oct 2002 (reference MIN/2002/0028, planning authority North Warwickshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date3 Jun 2003 (granted, reference MIN/2002/0028, planning authority North Warwickshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorDeMulder and Sons Ltd (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBiomass (dedicated)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.5540, -1.5081DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority North Warwickshire, reference MIN/2002/0028)
  2. Permit applied for (planning authority North Warwickshire, reference MIN/2002/0028)

How it compares

Nuneaton Animal Waste Incinerator is the 2,172nd-largest of 4,035 power plants in England and the 3,288th-largest of 5,834 in the United Kingdom by capacity; its 5 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,172nd of 4,035134,434 MW<0.1%
United Kingdom3,288th of 5,834200,500 MW<0.1%
All power plants in our data11,909th of 15,7991,918,113 MW<0.1%

Nearby

Within 50 km of this power plant: 7 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
Data center, England (OSM way 710050084)Data center——8.7 km
Santander data center, EnglandData center——20 km
Santander data center, EnglandData center——20 km
Weston Marsh to East LeicestershireTransmission line—Planned46 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom