Power plant · West Northamptonshire, England, United Kingdom

Newnham Grange Farm - Battery Energy Storage

Newnham Grange Farm - Battery Energy Storage is a planned battery storage plant in West Northamptonshire, England, United Kingdom, with 15 MW of capacity, operated by Neo Environmental.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWest Northamptonshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressN/O Newnham Grange Farm, Daventry, NN11 4FRDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date16 Jun 2025 (reference 2025/2366/FULL, planning authority West Northamptonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNeo Environmental (Neo Environmental (Belfast), applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity15 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.2537, -1.1198DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority West Northamptonshire, reference 2025/2366/FULL)

How it compares

Newnham Grange Farm - Battery Energy Storage is the 1,081st-largest of 1,650 power plants planned, permitted or under construction in England and the 1,745th-largest of 2,548 in the United Kingdom by capacity; its 15 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,081st of 1,650171,264 MW<0.1%
United Kingdom1,745th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data4,090th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 24 grid connections (12 operating, 98.1 MW), 12 substations and 9 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Hellermann Tyton DataData center——14 km
Cottisford PrimarySubstation——31 km
nLighten Milton KeynesData center——31 km
Shelswell Solar Park grid connectionGrid connection4.75 MWOperating31 km
Data center, England (OSM way 460010263)Data center——33 km
Tritax Symmetry Park grid connectionGrid connection15 MWPlanned34 km
Deddington PrimarySubstation——34 km
Hill Farm PV grid connectionGrid connection4.51 MWOperating36 km
Upper Heyford PrimarySubstation——37 km

Operator and place

More from Neo Environmental

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page