Power plant · Nuneaton and Bedworth, England, United Kingdom

Newgate Coolliery - Solar Farm & Battery Storage

Newgate Coolliery - Solar Farm & Battery Storage is a planned battery storage plant in Nuneaton and Bedworth, England, United Kingdom, with 5 MW of capacity, operated by Sirius Environmental Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNuneaton and Bedworth (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressBedworth Lane, Astley Lane, Coolliery Wood, CV12 0LPDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date10 May 2024 (reference 40290, planning authority Nuneaton and Bedworth)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSirius Environmental Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (co-located with re)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.4780, -1.5025DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Nuneaton and Bedworth, reference 40290)

How it compares

Newgate Coolliery - Solar Farm & Battery Storage is the 1,280th-largest of 1,650 power plants planned, permitted or under construction in England and the 2,046th-largest of 2,548 in the United Kingdom by capacity; its 5 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,280th of 1,650171,264 MW<0.1%
United Kingdom2,046th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data5,196th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 7 data centers, measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
Data center, England (OSM way 710050084)Data center——11 km
Santander data center, EnglandData center——23 km
Santander data center, EnglandData center——23 km

Operator and place

More from Sirius Environmental Limited

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page