Power plant · Eastleigh, England, United Kingdom

Netley Landfill Site, Hampshire (Extension)

Netley Landfill Site, Hampshire (Extension) is a power plant in Eastleigh, England, United Kingdom, with 1.2 MW of capacity, operated by Power Plant Services, Hampshire Waste Services and ONYX.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEastleigh (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNetley Landfill Site, Grange Road, Netley, HampshireDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year1997DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date26 Jan 1996 (Town and Country Planning Act, issued by Eastleigh)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date16 Jun 1995 (planning authority Eastleigh)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date26 Jan 1996 (granted, planning authority Eastleigh)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPower Plant Services (Hampshire Waste Services/ ONYX / Power Plant Services)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorHampshire Waste Services (Hampshire Waste Services/ ONYX / Power Plant Services)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorONYX (Hampshire Waste Services/ ONYX / Power Plant Services)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.2 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyLandfill GasDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.8897, -1.3345DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Eastleigh)
  3. Permit applied for (planning authority Eastleigh)

How it compares

Netley Landfill Site, Hampshire (Extension) is the 3,211th-largest of 3,430 power plants in England and the 4,760th-largest of 5,050 in the United Kingdom by capacity; its 1.2 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,211th of 3,43071,965 MW<0.1%
United Kingdom4,760th of 5,050115,622 MW<0.1%
All power plants in our data11,533rd of 12,0321,190,447 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 231 grid connections (131 operating, 1,162 MW), 190 substations, 8 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Netley PV grid connectionGrid connection9.5 MWOperating0.1 km
Waste 1.197 MW grid connection at WestonGrid connection1.2 MWOperating0.2 km
Hamble PrimarySubstation——1.5 km
Weston PrimarySubstation——1.7 km
Netley Common BSPSubstation——1.9 km
Nats Swanwick Solar PV grid connectionGrid connection3.84 MWPlanned3.6 km
Regit4uData center——6.2 km
SCCData center——6.6 km
AstrohouseData center——6.7 km

Operators and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page