Power plant · Redcar and Cleveland, England, United Kingdom

The Net Zero Teesside Project

The Net Zero Teesside Project is a permitted power plant in Redcar and Cleveland, England, United Kingdom, with 860 MW of capacity, operated by Net Zero Teesside Power Limited “NZT Power” and Net Zero North Sea Storage Limited “NZNS Storage”.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationRedcar and Cleveland (coordinates), EnglandPlanning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
LocationEnglandNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
AddressLand at and in the vicinity of Teesworks, Redcar, Teesside, TS10 5QWPlanning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (post-decision, granted)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date16 Feb 2024 (permit EN010103, Planning Act 2008 development consent, issued by Secretary of State)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Application date19 Jul 2021 (ref. EN010103, The Planning Inspectorate)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date16 Feb 2024 (granted, ref. EN010103, The Planning Inspectorate)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNet Zero Teesside Power Limited “NZT Power” and Net Zero North Sea Storage Limited “NZNS Storage”Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity860 MW (description)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyTidal LagoonPlanning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyGasPlanning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyCarbon capturePlanning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Area461 ha (application boundary)planning.data.gov.uk · record · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.6189, -1.1209Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

Also recorded as

2 sources record The Net Zero Teesside Project; this page joins their facts, each with its own source. Links to any of the records lead here. How records are matched.

Name in the sourceIdentifierSourceMatched on
The Net Zero Teesside Projectasset:pins-nsip:en010103Planning Inspectorate: National Infrastructure Projects—
Net Zero Teesside Power Projectasset:neso-tec:pro-001400NESO TEC RegisterSame name, technology, capacity and company

How it compares

The Net Zero Teesside Project is the 45th-largest of 2,174 power plants planned, permitted or under construction in England and the 73rd-largest of 3,222 in the United Kingdom by capacity; its 860 MW is 0.29% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England45th of 2,174186,088 MW0.46%
United Kingdom73rd of 3,222300,661 MW0.29%
All power plants planned, permitted or under construction in our data118th of 6,455664,240 MW0.13%

Nearby

Within 50 km of this power plant: 235 grid connections (120 operating, 1,225 MW) and 131 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Teesside Windfarm Ltd grid connectionGrid connection62 MWOperating1.4 km
Gas 50 MW grid connection at Phillips PetroleumGrid connection50 MWPlanned3.1 km
Gas 76 MW grid connection at Phillips PetroleumGrid connection76 MWOperating3.1 km
Tees Industrial T1 T2Substation——3.5 km
RedcarSubstation——4.3 km
GrangetownSubstation——4.5 km

Operator and place

Grid connections attached to this power plant

Other power plants in England

All 5809 power plants in England, United Kingdom