Power plant · East Devon, England, United Kingdom

National Grid Substation - Battery Energy Storage System

National Grid Substation - Battery Energy Storage System is a permitted battery storage plant in East Devon, England, United Kingdom, with 100 MW of capacity, operated by Penso Power.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEast Devon (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressE/O National Grid Substation, Broadclyst, Exeter, EX5 3DADESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date22 Aug 2025 (permit 25/0063/MFUL, Town and Country Planning Act, issued by East Devon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date15 Oct 2024 (reference 25/0063/MFUL, planning authority East Devon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date22 Aug 2025 (granted, reference 25/0063/MFUL, planning authority East Devon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPenso Power (Penso Power (BW ESS), applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity100 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.7681, -3.4107DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority East Devon, reference 25/0063/MFUL)
  2. Permit applied for (planning authority East Devon, reference 25/0063/MFUL)

How it compares

National Grid Substation - Battery Energy Storage System is the 234th-largest of 1,650 power plants planned, permitted or under construction in England and the 401st-largest of 2,548 in the United Kingdom by capacity; its 100 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England234th of 1,650171,264 MW<0.1%
United Kingdom401st of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data1,267th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 2 grid connections and 1 substation, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Newlands Power Plant grid connectionGrid connection52.5 MWPlanned33 km
Axminster GSPSubstation——34 km
Pipplepen Farm Solar PV grid connectionGrid connection32.6 MWPlanned47 km

Operator and place

More from Penso Power

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page