Power plant · Blaby, England, United Kingdom

National Grid Enderby Substation

National Grid Enderby Substation is a power plant in Blaby, England, United Kingdom, with 57 MW of capacity, operated by Gore Street.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBlaby (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNational Grid Land To North Of, Desford Road, Enderby, Leicester, Leicestershire, LE19 4ADDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2025DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date4 Feb 2021 (permit 20/0896/FUL, Town and Country Planning Act, issued by Blaby)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date28 Aug 2020 (reference 20/0896/FUL, planning authority Blaby)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date4 Feb 2021 (granted, reference 20/0896/FUL, planning authority Blaby)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGore StreetDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity57 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.6000, -1.2129DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Blaby, reference 20/0896/FUL)
  3. Permit applied for (planning authority Blaby, reference 20/0896/FUL)

How it compares

National Grid Enderby Substation is the 134th-largest of 3,430 power plants in England and the 285th-largest of 5,050 in the United Kingdom by capacity; its 57 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England134th of 3,43071,965 MW<0.1%
United Kingdom285th of 5,050115,622 MW<0.1%
All power plants in our data1,661st of 12,0321,190,447 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 7 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
Santander data center, EnglandData center——1.9 km
Santander data center, EnglandData center——2.4 km
Data center, England (OSM way 710050084)Data center——13 km
Weston Marsh to East LeicestershireTransmission line—Planned28 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom