Power plant · North Tyneside, England, United Kingdom

Mylord Crescent, Camperdown Industrial Estate, Unit 12 - Solar PV system

Mylord Crescent, Camperdown Industrial Estate, Unit 12 - Solar PV system is a permitted power plant in North Tyneside, England, United Kingdom, with 1.4 MW of capacity, operated by Entek International Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Tyneside (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressUnit 12, Mylord Crescent, Camperdown Industrial Estate, Camperdown, Newcastle Upon Tyne, NE12 5XGDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date16 Apr 2025 (permit 25/00231/GDO, Town and Country Planning Act, issued by North Tyneside)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date24 Feb 2025 (ref. 25/00231/GDO, North Tyneside)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date16 Apr 2025 (granted, ref. 25/00231/GDO, North Tyneside)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEntek International LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.4 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.0445, -1.5846DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Mylord Crescent, Camperdown Industrial Estate, Unit 12 - Solar PV system is the 1,959th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,955th-largest of 3,222 in the United Kingdom by capacity; its 1.4 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,959th of 2,174186,088 MW<0.1%
United Kingdom2,955th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data6,177th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 208 grid connections (104 operating, 1,231 MW) and 129 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
KillingworthSubstation——1.2 km
Gas 5.7 MW grid connection at KillingworthGrid connection5.7 MWOperating2.2 km
Solar 28.12 MW grid connection at BackworthGrid connection28.1 MWPlanned2.5 km
Seaton Burn T1Substation——3.7 km
SeghillSubstation——3.9 km
Waste 3.943 MW grid connection at SeghillGrid connection3.94 MWOperating3.9 km