Power plant · Swindon, England, United Kingdom

Mount Pleasant Farm - Solar Farm

Mount Pleasant Farm - Solar Farm is a planned power plant in Swindon, England, United Kingdom, with 35 MW of capacity, operated by Belltown Power Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSwindon (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressMount Pleasant Farm, Mount Pleasant Farm Lane, Horpit, Swindon, SN4 0AUDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date4 Jun 2025 (reference S/25/0666, planning authority Swindon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBelltown Power LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity35 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area48.6 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.5651, -1.6833DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Swindon, reference S/25/0666)

How it compares

Mount Pleasant Farm - Solar Farm is the 938th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,489th-largest of 3,222 in the United Kingdom by capacity; its 35 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England938th of 2,174185,888 MW<0.1%
United Kingdom1,489th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data2,772nd of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 243 grid connections (130 operating, 1,554 MW), 158 substations and 10 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Mount Pleasant Solar Energy Hub grid connectionGrid connection49.9 MWPlanned0.5 km
Dorcan South PrimarySubstation——3.2 km
Shrivenham PrimarySubstation——3.2 km
Roves Farm PV grid connectionGrid connection8.55 MWOperating4.0 km
Park North PrimarySubstation——4.0 km
HONDA grid connectionGrid connection4.28 MWOperating4.8 km
nLighten SwindonData center——5.2 km
AWS Swindon Data CentreData center——7.2 km
Nationwide Swindon Technology CentreData center——11 km

Operator and place

Grid connections attached to this power plant

More from Belltown Power Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page