Power plant · Buckinghamshire, England, United Kingdom

Mop End Farm, Mop End Lane - Battery Energy Storage

Mop End Farm, Mop End Lane - Battery Energy Storage is a planned power plant in Buckinghamshire, England, United Kingdom, with 500 MW of capacity, operated by Sandbrook Capital BES Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBuckinghamshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressMop End Farm, Mop End Lane, Mop End, Amersham, HP7 0QPDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date15 Aug 2025 (reference PL/25/2447/FA, planning authority Buckinghamshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSandbrook Capital BES LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity500 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.6650, -0.6619DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Mop End Farm, Mop End Lane - Battery Energy Storage is the 70th-largest of 2,174 power plants planned, permitted or under construction in England and the 107th-largest of 3,222 in the United Kingdom by capacity; its 500 MW is 0.17% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England70th of 2,174186,088 MW0.27%
United Kingdom107th of 3,222300,661 MW0.17%
All power plants planned, permitted or under construction in our data249th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 202 substations, 147 data centers (1 operating, 88 MW), 145 grid connections (68 operating, 736 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Amersham GSPSubstation——0.4 km
Generation 99 MW grid connection at Amersham MainGrid connection99 MWPlanned2.0 km
Bowerdean PrimarySubstation——5.9 km
Beaconsfield (Middle Busbars) PrimarySubstation——6.0 km
Derehams Farm grid connectionGrid connection100 MWPlanned6.4 km
Loudwater grid connectionGrid connection40 MWOperating6.4 km
CapitaLand Ascendas REIT data center, High WycombeData center——9.5 km
SDC M40 CampusData center—Planned9.8 km
Data center, England (OSM way 1460602301)Data center—Under construction12 km

Operator and place

More from Sandbrook Capital BES Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page