Power plant · Cherwell, England, United Kingdom

Manor Farm, Noke - Solar Farm

Manor Farm, Noke - Solar Farm is a permitted solar power plant in Cherwell, England, United Kingdom, with 45 MW of capacity, operated by Green Nation.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCherwell (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressManor Farm, Noke, Oxford, OX33 9TXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (appeal granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date16 Sept 2025 (permit 22/01682/F, Town and Country Planning Act, issued by Cherwell)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date7 Jun 2022 (reference 22/01682/F, planning authority Cherwell)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date16 Sept 2025 (appeal granted, reference 22/01682/F, planning authority Cherwell)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date16 Sept 2025 (granted, reference 22/01682/F, planning authority Cherwell)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date18 Jul 2024 (refused, reference 22/01682/F, planning authority Cherwell)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGreen Nation (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity45 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area43.8 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.8234, -1.2090DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Cherwell, reference 22/01682/F)
  2. Permit granted (appeal granted, planning authority Cherwell, reference 22/01682/F)
  3. Permit refused (planning authority Cherwell, reference 22/01682/F)
  4. Permit applied for (planning authority Cherwell, reference 22/01682/F)

How it compares

Manor Farm, Noke - Solar Farm is the 660th-largest of 1,650 power plants planned, permitted or under construction in England and the 1,092nd-largest of 2,548 in the United Kingdom by capacity; its 45 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England660th of 1,650171,264 MW<0.1%
United Kingdom1,092nd of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data2,242nd of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 141 grid connections (68 operating, 658 MW), 137 substations and 24 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Noke Solar Farm - PV grid connectionGrid connection18 MWPlanned1.0 km
Rowles Farm PV grid connectionGrid connection9.5 MWOperating2.2 km
Family Farmhouse grid connectionGrid connection12.6 MWPlanned3.3 km
Lovelace Road PrimarySubstation——5.7 km
Headington BSPSubstation——6.0 km
Headington PrimarySubstation——6.1 km
University Shared Data CentreData center——7.7 km
AWS Didcot Data CentreData center——23 km
Data center, England (OSM way 1254986167)Data center——28 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page