Power plant · Maidstone, England, United Kingdom

Manor Farm, Laddingford - Solar Farm

Manor Farm, Laddingford - Solar Farm is a planned power plant in Maidstone, England, United Kingdom, with 4.9 MW of capacity, operated by Boom Developments Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationMaidstone (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressManor Farm, Laddingford, Maidstone, ME18 6BXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date30 Mar 2026 (reference 26/500678/FULL, planning authority Maidstone)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBoom Developments LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity4.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area9.64 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.2111, 0.4255DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Maidstone, reference 26/500678/FULL)

How it compares

Manor Farm, Laddingford - Solar Farm is the 1,674th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,566th-largest of 3,222 in the United Kingdom by capacity; its 4.9 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,674th of 2,174185,888 MW<0.1%
United Kingdom2,566th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data5,699th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 52 data centers and 2 grid connections (1 operating, 6.94 MW), measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.

NameKindSizeStatusDistance
CXD Infrastructure SolutionsData center——11 km
CustodianDC MaidstoneData center——12 km
Sota DatacentreData center——24 km
Solar 6.935 MW grid connection at Maiden NewtonGrid connection6.94 MWOperating40 km
Tertiary Study grid connectionGrid connection57 MWPlanned50 km

Operator and place

More from Boom Developments Limited

Other power plants in England

All 5809 power plants in England, United Kingdom