Power plant · South Kesteven, England, United Kingdom
Manor Farm
Manor Farm is a cancelled power plant in South Kesteven, England, United Kingdom, with 26 MW of capacity, operated by Coriolis Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | South Kesteven (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Manor Farm, Newgate Lane, Londonthorpe, Grantham, Lincolnshire, NG31 9RY | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Cancelled (planning permission expired) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 14 May 2019 (permit S19/0181, Town and Country Planning Act, issued by South Kesteven) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 28 Jan 2019 (reference S19/0181, planning authority South Kesteven) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 14 May 2019 (granted, reference S19/0181, planning authority South Kesteven) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Coriolis Energy | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 26 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.9272, -0.5841 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit expired
- Permit granted (planning authority South Kesteven, reference S19/0181)
- Permit applied for (planning authority South Kesteven, reference S19/0181)
How it compares
Manor Farm is the 451st-largest of 3,430 power plants in England and the 852nd-largest of 5,050 in the United Kingdom by capacity; its 26 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 451st of 3,430 | 71,965 MW | <0.1% |
| United Kingdom | 852nd of 5,050 | 115,622 MW | <0.1% |
| All power plants in our data | 3,180th of 12,032 | 1,190,447 MW | <0.1% |
Nearby
Within 50 km of this power plant: 5 data centers, 4 grid connections (14.4 MW), 3 transmission lines and 1 substation, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Digital Space DC - Newark | Data center | — | — | 22 km |
| Triton Knoll Electrical System | Transmission line | — | Permitted | 24 km |
| Weston Marsh to East Leicestershire | Transmission line | — | Planned | 29 km |
| Eastern Green Link 3 and Eastern Green Link 4 | Transmission line | — | Planned | 34 km |
| Experian | Data center | — | — | 38 km |
| Hall Water Treatment Works grid connection | Grid connection | 1.6 MW | Operating | 38 km |
| Newton on Trent Water Works grid connection | Grid connection | 3.1 MW | Operating | 40 km |
| nLighten Nottingham | Data center | — | — | 43 km |
| Stow | Substation | — | — | 45 km |
Operator and place
More from Coriolis Energy
- Y Bryn Wind Farm130 MW
- Glendye Estate104 MW · permitted
- Blarghour Wind Farm84 MW · permitted
- Kirkan Wind Farm81.6 MW · permitted
- Greystone Knowe Wind Farm - Wind Farm75 MW · planned
- Tontine Road - Battery Energy Storage System70 MW · planned
- Vale of Leven Wind Farm70 MW · planned
- Lower Alt Wind Farm42 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.