Power plant · Bolsover, England, United Kingdom

Lindrick Way, Barlborough - Solar Panels

Lindrick Way, Barlborough - Solar Panels is a permitted solar power plant in Bolsover, England, United Kingdom, with 1.3 MW of capacity, operated by Coster Special Technology.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBolsover (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Address8 Lindrick Way, Barlborough, Chesterfield, S43 4XEDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date28 Feb 2024 (permit 24/00044/DETOTH, Town and Country Planning Act, issued by Bolsover)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date1 Feb 2024 (reference 24/00044/DETOTH, planning authority Bolsover)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date28 Feb 2024 (granted, reference 24/00044/DETOTH, planning authority Bolsover)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorCoster Special Technology (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.3 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.2823, -1.2791DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Bolsover, reference 24/00044/DETOTH)
  2. Permit applied for (planning authority Bolsover, reference 24/00044/DETOTH)

How it compares

Lindrick Way, Barlborough - Solar Panels is the 1,511th-largest of 1,650 power plants planned, permitted or under construction in England and the 2,373rd-largest of 2,548 in the United Kingdom by capacity; its 1.3 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,511th of 1,650171,264 MW<0.1%
United Kingdom2,373rd of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data5,616th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 201 grid connections (108 operating, 1,211 MW), 170 substations, 9 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Wind 20.22 MW grid connection at Pennyhill WindfarmGrid connection20.2 MWOperating4.3 km
Kiveton ParkSubstation——6.0 km
Wind 4.5 MW grid connection at Kiveton ParkGrid connection4.5 MWOperating6.1 km
Battery storage 40 MW grid connection at Kiveton Park PS DirectGrid connection40 MWPlanned6.3 km
BeightonSubstation——8.9 km
HackenthorpeSubstation——10 km
Hive ITData center——17 km
UoS IT ServicesData center——18 km
HSBC Data CentreData center——27 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page