Power plant · South Gloucestershire, England, United Kingdom
Larks Lane & Latteridge Lane, Latteridge - Battery Storage Facility
Larks Lane & Latteridge Lane, Latteridge - Battery Storage Facility is a permitted power plant in South Gloucestershire, England, United Kingdom, with 49.9 MW of capacity, operated by Anglo Renewables.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | South Gloucestershire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Land Between Larks Lane And Latteridge Lane Latteridge, BS37 9TY | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 4 Jan 2024 (permit P23/02270/F, Town and Country Planning Act, issued by South Gloucestershire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 7 Aug 2023 (reference P23/02270/F, planning authority South Gloucestershire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 4 Jan 2024 (granted, reference P23/02270/F, planning authority South Gloucestershire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Anglo Renewables | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 49.9 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.5664, -2.4791 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority South Gloucestershire, reference P23/02270/F)
- Permit applied for (planning authority South Gloucestershire, reference P23/02270/F)
How it compares
Larks Lane & Latteridge Lane, Latteridge - Battery Storage Facility is the 514th-largest of 2,174 power plants planned, permitted or under construction in England and the 886th-largest of 3,222 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 514th of 2,174 | 185,888 MW | <0.1% |
| United Kingdom | 886th of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,966th of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 112 grid connections (68 operating, 876 MW), 50 substations, 12 data centers, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| University of Bristol Isambard-AI | AI supercomputer | 5,448 H100e | Operating | 7.6 km |
| nLighten Bristol | Data center | — | — | 7.7 km |
| Alderton Primary | Substation | — | — | 18 km |
| Castle Combe PV grid connection | Grid connection | 11.4 MW | Operating | 20 km |
| 40MW grid connection | Grid connection | 40 MW | Planned | 22 km |
| Yatton Keynell Primary | Substation | — | — | 23 km |
| Hullavington PV Farm grid connection | Grid connection | 6.65 MW | Operating | 23 km |
| Spring Quarry West Primary | Substation | — | — | 24 km |
| Ark Data Centres | Data center | — | — | 24 km |
Operator and place
More from Anglo Renewables
- Lowlands Farm - Battery Storage50 MW · permitted
- Penstone Lane, Penn 1 - Battery Storage Facility50 MW · permitted
- Penstone Lane, Lower Penn 2 - Battery Storage50 MW · permitted
- Says Court Farm, Coalpit Heath - Battery Energy Storage50 MW · permitted
- Levedale Road, Levedale - Battery Energy Storage50 MW · permitted
- Whites Farm - Battery Storage49.9 MW
- Weston Lane - Battery Storage Facility49.9 MW
- Rock Farm - Solar Farm40 MW · under construction
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI supercomputers, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.