Power plant · King's Lynn and West Norfolk, England, United Kingdom
Lapwing Fen 2 - Battery Storage Plant
Lapwing Fen 2 - Battery Storage Plant is a power plant under construction in King's Lynn and West Norfolk, England, United Kingdom, with 250 MW of capacity, operated by Tribus Clean Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | King's Lynn and West Norfolk (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Flower Farm, The Marsh, Walpole St. Andrew, Wisbech, PE14 7JG | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Under construction | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 27 Apr 2020 (permit 19/02004/FM, Town and Country Planning Act, issued by King's Lynn and West Norfolk) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 25 Nov 2019 (reference 19/02004/FM, planning authority King's Lynn and West Norfolk) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 27 Apr 2020 (granted, reference 19/02004/FM, planning authority King's Lynn and West Norfolk) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Tribus Clean Energy | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 250 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.7292, 0.1756 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Construction started
- Permit granted (planning authority King's Lynn and West Norfolk, reference 19/02004/FM)
- Permit applied for (planning authority King's Lynn and West Norfolk, reference 19/02004/FM)
How it compares
Lapwing Fen 2 - Battery Storage Plant is the 158th-largest of 2,174 power plants planned, permitted or under construction in England and the 246th-largest of 3,222 in the United Kingdom by capacity; its 250 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 158th of 2,174 | 185,888 MW | 0.13% |
| United Kingdom | 246th of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 588th of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 4 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Kings Lynn B Connection Project | Transmission line | — | Permitted | 13 km |
| Longmarsh Green Energy | Data center | — | Planned | 14 km |
| Positive Park | Data center | — | — | 18 km |
| Eastern Green Link 3 and Eastern Green Link 4 | Transmission line | — | Planned | 32 km |
| Triton Knoll Electrical System | Transmission line | — | Permitted | 35 km |
| Data center, England (OSM way 87850427) | Data center | — | — | 35 km |
Operator and place
More from Tribus Clean Energy
- Torksey Ferry Road, Rampton - Battery Energy Storage500 MW · permitted
- Model Farm49.9 MW · permitted
- Model Farm49.9 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.