Power plant · Cherwell, England, United Kingdom

Land South West Of Apollo Business Park

Land South West Of Apollo Business Park is a power plant in Cherwell, England, United Kingdom, with 1.7 MW of capacity, operated by Cyrasol Ecotec.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCherwell (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressDrift Lane Wroxton OxfordshireDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2014DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date3 Apr 2013 (permit 13/00015/F, Town and Country Planning Act, issued by Cherwell)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date18 Jan 2013 (reference 13/00015/F, planning authority Cherwell)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date3 Apr 2013 (granted, reference 13/00015/F, planning authority Cherwell)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorCyrasol EcotecDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.7 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.0799, -1.4139DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Cherwell, reference 13/00015/F)
  3. Permit applied for (planning authority Cherwell, reference 13/00015/F)

How it compares

Land South West Of Apollo Business Park is the 2,999th-largest of 3,430 power plants in England and the 4,453rd-largest of 5,050 in the United Kingdom by capacity; its 1.7 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,999th of 3,43071,965 MW<0.1%
United Kingdom4,453rd of 5,050115,622 MW<0.1%
All power plants in our data10,878th of 12,0321,190,447 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 67 grid connections (24 operating, 243 MW), 52 substations and 7 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Deddington PrimarySubstation——14 km
Hill Farm PV grid connectionGrid connection4.51 MWOperating14 km
Duns TEW Solar Farm grid connectionGrid connection6 MWPlanned14 km
Spring Farm grid connectionGrid connection13.2 MWPlanned15 km
Chipping Norton PrimarySubstation——18 km
Kiddington PrimarySubstation——19 km
University Shared Data CentreData center——37 km
Hellermann Tyton DataData center——38 km
nLighten Milton KeynesData center——41 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page