Land North of the A11 - Solar Park

Land North of the A11 - Solar Park is a cancelled solar power plant in Breckland, England, United Kingdom, with 1 MW of capacity.

Map: where Land North of the A11 - Solar Park lies
52.5200, 0.9955 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBreckland (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission granted, permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date26 Oct 2022 (permit 3PL/2021/1514/F, Town and Country Planning Act, issued by Breckland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date10 Nov 2021 (reference 3PL/2021/1514/F, planning authority Breckland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date26 Oct 2022 (granted, reference 3PL/2021/1514/F, planning authority Breckland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area2.7 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.5200, 0.9955DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its owner.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the owner.

Latest events

Dated events about this power plant from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Permit granted (planning authority Breckland, reference 3PL/2021/1514/F)
  2. Permit applied for (planning authority Breckland, reference 3PL/2021/1514/F)

How it compares

Land North of the A11 - Solar Park was cancelled before it was built: it is not ranked among the power plants that run, and its 1 MW is not counted in their totals.

Nearby

Within 50 km of this power plant: 188 grid connections (120 operating, 1,915 MW), 111 substations, 2 transmission lines and 2 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Crows Hall Farm/Lane grid connectionGrid connection1.56 MWOperating0.2 km
Attleborough Primary 11kVSubstation——2.1 km
(ANM) Bunwell Road grid connectionGrid connection18 MWPlanned3.7 km
Snetterton Primary 11kVSubstation——5.2 km
Chalk Lane Snetterton Norwich grid connectionGrid connection3 MWOperating5.3 km
Hardingham Primary 11kVSubstation——8.7 km
Norwich to TilburyTransmission line—Planned20 km
US Air Force data center, BrandonData center——33 km
Longmarsh Green EnergyData center—Planned46 km