Land North of Hill Farm is a permitted power plant in Cherwell, England, United Kingdom, with 8.9 MW of capacity, operated by Greenheath Farming.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCherwell (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand North Of Hill Farm, Hill Farm Lane, Duns Tew, Bicester, OX25DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date5 Oct 2020 (permit 20/00574/F, Town and Country Planning Act, issued by Cherwell)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date26 Feb 2020 (reference 20/00574/F, planning authority Cherwell)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date5 Oct 2020 (granted, reference 20/00574/F, planning authority Cherwell)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGreenheath FarmingDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity8.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area12.8 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.9666, -1.3281DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Cherwell, reference 20/00574/F)
  2. Permit applied for (planning authority Cherwell, reference 20/00574/F)

How it compares

Land North of Hill Farm is the 1,519th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,355th-largest of 3,222 in the United Kingdom by capacity; its 8.9 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,519th of 2,174185,888 MW<0.1%
United Kingdom2,355th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data5,454th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 104 grid connections (48 operating, 472 MW), 67 substations and 10 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Deddington PrimarySubstation——0.6 km
Hill Farm PV grid connectionGrid connection4.51 MWOperating0.6 km
Duns TEW Solar Farm grid connectionGrid connection6 MWPlanned0.6 km
Spring Farm grid connectionGrid connection13.2 MWPlanned1.9 km
Kiddington PrimarySubstation——6.4 km
Upper Heyford PrimarySubstation——7.0 km
University Shared Data CentreData center——24 km
nLighten Milton KeynesData center——36 km
Data center, England (OSM way 1254986167)Data center——36 km

Operator and place

More from Greenheath Farming

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page