Power plant · Westmorland and Furness, England, United Kingdom

Land at Skelton Radio Transmitter Site Solar Farm

Land at Skelton Radio Transmitter Site Solar Farm is a cancelled solar power plant in Westmorland and Furness, England, United Kingdom, with 5 MW of capacity, operated by New Energy for the World.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWestmorland and Furness (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand at, Skelton Radio Transmitter Site, Skelton, Penrith, Cumbria, North West, CA11 9SYDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning application withdrawn)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date23 Oct 2015 (reference 15/0907, planning authority Westmorland and Furness)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date12 Apr 2017 (withdrawn, reference 15/0907, planning authority Westmorland and Furness)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNew Energy for the World (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area8.96 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.7266, -2.8753DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Withdrawn (planning authority Westmorland and Furness, reference 15/0907)
  2. Permit applied for (planning authority Westmorland and Furness, reference 15/0907)

How it compares

Land at Skelton Radio Transmitter Site is the 2,172nd-largest of 4,035 power plants in England and the 3,288th-largest of 5,834 in the United Kingdom by capacity; its 5 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,172nd of 4,035134,434 MW<0.1%
United Kingdom3,288th of 5,834200,500 MW<0.1%
All power plants in our data11,909th of 15,7991,918,113 MW<0.1%

Nearby

Within 50 km of this power plant: 106 grid connections (53 operating, 512 MW), 54 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Land to West of Town End Farm, Skelton grid connectionGrid connection5 MWPlanned1.5 km
Skelton CSubstation——1.5 km
Inglewood Solar Farm grid connectionGrid connection30 MWPlanned2.4 km
Hutton EndSubstation——2.9 km
Low Dyke grid connectionGrid connection6 MWPlanned3.1 km
Penrith & Shap BSPSubstation——9.3 km
Cross Border Connection (England)Transmission line—Planned47 km

Operator and place

More from New Energy for the World

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page