Owner · Company
New Energy for the World
New Energy for the World operates 13 power plants in the United Kingdom.
Portfolio
The 13 assets and rights New Energy for the World owns, operates or holds, by class, with its role in each. Sizes are the whole asset's, so they are not added up: the sources give no share for this owner.
Power plants 13
| Power plant | Location | Role | Capacity |
|---|---|---|---|
| Blackdyke Farm | Cumberland, England, United Kingdom | Operator | 7.7 MW |
| Fountain Lot Solar Farm | North Yorkshire, England, United Kingdom | Operator | 5 MW |
| Greaves Solar Farm | Westmorland and Furness, England, United Kingdom | Operator | 5 MW |
| Hill Solar Farm | Westmorland and Furness, England, United Kingdom | Operator | 5 MW |
| Land at Skelton Radio Transmitter Site | Westmorland and Furness, England, United Kingdom | Operator | 5 MW |
| Long Marton | Westmorland and Furness, England, United Kingdom | Operator | 5 MW |
| Lower Blakemore Farm | South Hams, England, United Kingdom | Operator | 5 MW |
| Lower Venn Farm | Herefordshire, County of, England, United Kingdom | Operator | 5 MW |
| Newfold Solar Farm | Fylde, England, United Kingdom | Operator | 5 MW |
| Orton Solar Farm | Westmorland and Furness, England, United Kingdom | Operator | 5 MW |
| Tunstall Hall Farm | Stafford, England, United Kingdom | Operator | 5 MW |
| West Newton | Cumberland, England, United Kingdom | Operator | 5 MW |
| Whitestone Solar Farm | Westmorland and Furness, England, United Kingdom | Operator | 5 MW |
By country
Where the assets and rights are.
- The United Kingdom13 power plants
Latest events
Dated events about New Energy for the World and its assets from official notices and registers, newest first: the latest 8 of 29. All recent changes.
- Withdrawn: Land at Skelton Radio Transmitter Site (planning authority Westmorland and Furness, reference 15/0907)
- Permit refused: Orton Solar Farm (planning authority Westmorland and Furness, reference 15/0667)
- Commissioned: Greaves Solar Farm
- Commissioned: Lower Venn Farm
- Permit refused: Lower Blakemore Farm (appeal refused, planning authority South Hams, reference 23/2373/14/F)
- Permit refused: West Newton (planning authority Cumberland, reference 2/2015/0620)
- Permit refused: Long Marton (planning authority Westmorland and Furness, reference 15/0908)
- Withdrawn: Hill Solar Farm (planning authority Westmorland and Furness, reference B06/2015/0532)
Research on New Energy for the World.Its full portfolio, its parent companies, and an introduction to the people who decide on buying and selling.
Request researchData on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.