Power plant · Tunbridge Wells, England, United Kingdom

Land At Pullen Farm

Land At Pullen Farm is a cancelled power plant in Tunbridge Wells, England, United Kingdom, with 10 MW of capacity, operated by Novus Solar Developments.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationTunbridge Wells (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand At Pullen Farm, Staplehurst Road, Frittenden, Cranbrook, TN17 2EEDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (appeal refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date30 Jun 2015 (reference 15/503884/FULL, planning authority Tunbridge Wells)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date25 Aug 2017 (appeal refused, reference 15/503884/FULL, planning authority Tunbridge Wells)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date24 Mar 2016 (refused, reference 15/503884/FULL, planning authority Tunbridge Wells)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNovus Solar DevelopmentsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity10 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.1524, 0.5929DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (appeal refused, planning authority Tunbridge Wells, reference 15/503884/FULL)
  2. Permit refused (planning authority Tunbridge Wells, reference 15/503884/FULL)
  3. Permit applied for (planning authority Tunbridge Wells, reference 15/503884/FULL)

How it compares

Land At Pullen Farm is the 1,102nd-largest of 3,430 power plants in England and the 1,838th-largest of 5,050 in the United Kingdom by capacity; its 10 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,102nd of 3,43071,965 MW<0.1%
United Kingdom1,838th of 5,050115,622 MW<0.1%
All power plants in our data7,081st of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 9 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
CXD Infrastructure SolutionsData center——14 km
CustodianDC MaidstoneData center——15 km
Sota DatacentreData center——20 km
Richborough Connection ProjectTransmission line—Permitted49 km

Operator and place

More from Novus Solar Developments

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page