Power plant · Stroud, England, United Kingdom
Land At Actrees Farm
Land At Actrees Farm is a solar power plant in Stroud, England, United Kingdom, with 5 MW of capacity, operated by Actrees Solar Power and Vogt Solar.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Stroud (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Land At Actrees Farm, Heathfield, Alkington, Berkeley, GL13 9PP | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2016 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 29 Oct 2015 (permit S.15/1523/FUL, Town and Country Planning Act, issued by Stroud) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 26 Jun 2015 (reference S.15/1523/FUL, planning authority Stroud) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 29 Oct 2015 (granted, reference S.15/1523/FUL, planning authority Stroud) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Actrees Solar Power (Actrees Solar Power/ Vogt Solar) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Vogt Solar (Actrees Solar Power/ Vogt Solar) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 5 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.6820, -2.4167 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Commissioned
- Permit granted (planning authority Stroud, reference S.15/1523/FUL)
- Permit applied for (planning authority Stroud, reference S.15/1523/FUL)
How it compares
Land At Actrees Farm is the 2,172nd-largest of 4,035 power plants in England and the 3,288th-largest of 5,834 in the United Kingdom by capacity; its 5 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,172nd of 4,035 | 134,434 MW | <0.1% |
| United Kingdom | 3,288th of 5,834 | 200,500 MW | <0.1% |
| All power plants in our data | 11,909th of 15,799 | 1,918,113 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Started operating
Nearby
Within 50 km of this power plant: 113 grid connections (71 operating, 935 MW), 50 substations, 13 data centers, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Tetbury Primary | Substation | — | — | 19 km |
| nLighten Bristol | Data center | — | — | 19 km |
| Alderton Primary | Substation | — | — | 19 km |
| University of Bristol Isambard-AI | AI supercomputer | 5,448 H100e | Operating | 21 km |
| DXC Technology | Data center | — | — | 22 km |
| Marsh Farm B PV grid connection | Grid connection | 11.4 MW | Operating | 23 km |
| Long Newton PV grid connection | Grid connection | 5.8 MW | Operating | 23 km |
| Sunstroom grid connection | Grid connection | 4.28 MW | Operating | 23 km |
| Malmesbury Primary | Substation | — | — | 24 km |
Operators and place
Other power plants in England
- Drax Power Station Biomass Units2,580 MW
- Ratcliffe-on-Soar2,021 MW
- Cottam2,000 MW
- Walpole Flexible Generation Project2,000 MW
- West Burton2,000 MW
- Eggborough1,960 MW
- Staythorpe1,828 MW
- Fiddler’s Ferry1,510 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DUKES 5.11: Power stations in the United Kingdom, Open Government Licence v3.0.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI supercomputers, CC BY 4.0.
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- Wikidata. Wikidata, CC0 1.0.