Power plant · North East Lincolnshire, England, United Kingdom

Laceby Solar Farm

Laceby Solar Farm is a power plant in North East Lincolnshire, England, United Kingdom, with 27.1 MW of capacity, operated by Conergy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth East Lincolnshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand At Manor Top Farm Manor Top Farm Access Road To Laceby, DN37 7EADESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2016DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date19 Jun 2015 (permit DM/0174/15/FUL, Town and Country Planning Act, issued by North East Lincolnshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date5 Mar 2015 (ref. DM/0174/15/FUL, North East Lincolnshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Jun 2015 (granted, ref. DM/0174/15/FUL, North East Lincolnshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorConergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity27.1 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area36.6 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.5259, -0.1427DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Laceby Solar Farm is the 434th-largest of 3,430 power plants in England and the 825th-largest of 5,050 in the United Kingdom by capacity; its 27.1 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England434th of 3,43071,985 MW<0.1%
United Kingdom825th of 5,050115,642 MW<0.1%
All power plants in our data3,071st of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. DM/0174/15/FUL
  2. Started operating

Nearby

Within 50 km of this power plant: 241 grid connections (105 operating, 1,698 MW), 98 substations, 4 transmission lines and 1 CO2 emitter, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Solar 8 MW grid connection at Laceby SolarGrid connection8 MWOperating0.8 km
Battery storage and Solar 45 MW grid connection at Beelsby Hall Hybrid DirectGrid connection45 MWPlanned2.2 km
Battery storage and Solar and Wind 299.7 MW grid connection at Little Becks Hybrid DirectGrid connection300 MWPlanned2.2 km
ScarthoSubstation——3.0 km
Grimsby WestSubstation——4.5 km
Yarborough Road 132/33kVSubstation——4.9 km
Aldbrough Hydrogen StorageCO2 emitter—Planned32 km
Grimsby to WalpoleTransmission line—Planned34 km
Continental Link Multi-Purpose InterconnectorTransmission line—Cancelled35 km

Operator and place

More from Conergy

Other power plants in England

All 5809 power plants in England, United Kingdom