Power plant · Swindon, England, United Kingdom

Keypoint, South Marston - Solar panels

Keypoint, South Marston - Solar panels is a permitted power plant in Swindon, England, United Kingdom, with 1.09 MW of capacity, operated by Logicor.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSwindon (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressKeypoint, Unit 1, Thornhill Road, South Marston, Swindon, SN3 4RYDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date17 Jan 2024 (permit S/23/0893, Town and Country Planning Act, issued by Swindon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date14 Sept 2023 (reference S/23/0893, planning authority Swindon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date17 Jan 2024 (granted, reference S/23/0893, planning authority Swindon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLogicorDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.09 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.5885, -1.7220DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Swindon, reference S/23/0893)
  2. Permit applied for (planning authority Swindon, reference S/23/0893)

How it compares

Keypoint, South Marston - Solar panels is the 2,060th-largest of 2,174 power plants planned, permitted or under construction in England and the 3,073rd-largest of 3,222 in the United Kingdom by capacity; its 1.09 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England2,060th of 2,174185,888 MW<0.1%
United Kingdom3,073rd of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data6,305th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 224 grid connections (124 operating, 1,385 MW), 148 substations and 10 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
HONDA grid connectionGrid connection4.28 MWOperating1.2 km
HONDA grid connectionGrid connection9.5 MWOperating1.2 km
Sevor Farm Solar grid connectionGrid connection19 MWOperating1.4 km
nLighten SwindonData center——1.6 km
Stratton (Main) BSPSubstation——2.5 km
Stratton (Reserve) BSPSubstation——2.5 km
Stratton PrimarySubstation——2.6 km
AWS Swindon Data CentreData center——7.7 km
Nationwide Swindon Technology CentreData center——8.1 km

Operator and place

More from Logicor

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page