Power plant · Swindon, England, United Kingdom
Keypoint, South Marston - Solar panels
Keypoint, South Marston - Solar panels is a permitted power plant in Swindon, England, United Kingdom, with 1.09 MW of capacity, operated by Logicor.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Swindon (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Keypoint, Unit 1, Thornhill Road, South Marston, Swindon, SN3 4RY | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 17 Jan 2024 (permit S/23/0893, Town and Country Planning Act, issued by Swindon) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 14 Sept 2023 (reference S/23/0893, planning authority Swindon) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 17 Jan 2024 (granted, reference S/23/0893, planning authority Swindon) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Logicor | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 1.09 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.5885, -1.7220 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Swindon, reference S/23/0893)
- Permit applied for (planning authority Swindon, reference S/23/0893)
How it compares
Keypoint, South Marston - Solar panels is the 2,060th-largest of 2,174 power plants planned, permitted or under construction in England and the 3,073rd-largest of 3,222 in the United Kingdom by capacity; its 1.09 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,060th of 2,174 | 185,888 MW | <0.1% |
| United Kingdom | 3,073rd of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 6,305th of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 224 grid connections (124 operating, 1,385 MW), 148 substations and 10 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| HONDA grid connection | Grid connection | 4.28 MW | Operating | 1.2 km |
| HONDA grid connection | Grid connection | 9.5 MW | Operating | 1.2 km |
| Sevor Farm Solar grid connection | Grid connection | 19 MW | Operating | 1.4 km |
| nLighten Swindon | Data center | — | — | 1.6 km |
| Stratton (Main) BSP | Substation | — | — | 2.5 km |
| Stratton (Reserve) BSP | Substation | — | — | 2.5 km |
| Stratton Primary | Substation | — | — | 2.6 km |
| AWS Swindon Data Centre | Data center | — | — | 7.7 km |
| Nationwide Swindon Technology Centre | Data center | — | — | 8.1 km |
Operator and place
More from Logicor
- Clipper Logistics, Shepcote Lane - Solar Panels1.08 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.