Power plant · Nuneaton and Bedworth, England, United Kingdom

Judkins Landfill Scheme

Judkins Landfill Scheme is a power plant in Nuneaton and Bedworth, England, United Kingdom, with 2.7 MW of capacity, operated by Waste Recycling Group.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNuneaton and Bedworth (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressJudkins Landfill Site Tuttle Hill Nuneaton WarwickshireDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year1999DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorWaste Recycling GroupDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity2.7 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyLandfill GasDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.5326, -1.4795DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Judkins Landfill Scheme is the 2,631st-largest of 3,430 power plants in England and the 3,877th-largest of 5,050 in the United Kingdom by capacity; its 2.7 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,631st of 3,43071,985 MW<0.1%
United Kingdom3,877th of 5,050115,642 MW<0.1%
All power plants in our data9,879th of 12,0081,173,302 MW<0.1%

Nearby

Within 50 km of this power plant: 407 grid connections, 7 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Nuneaton BESS Facility grid connectionGrid connection——1.1 km
George Eliot Hospital grid connectionGrid connection——2.2 km
Top Farm, MU4789 grid connectionGrid connection——2.2 km
Data center, England (OSM way 710050084)Data center——6.7 km
Santander data center, EnglandData center——19 km
Santander data center, EnglandData center——19 km
Weston Marsh to East LeicestershireTransmission line—Planned46 km

Operator and place

More from Waste Recycling Group

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page