Power plant · Chesterfield, England, United Kingdom

Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage

Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage is a power plant in Chesterfield, England, United Kingdom, with 31 MW of capacity, operated by Low Carbon.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationChesterfield (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressW/O Inkersall Road, Staveley, Chesterfield, S43 3YJDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date20 Apr 2021 (permit CHE/20/00432/FUL, Town and Country Planning Act, issued by Chesterfield)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date20 Jul 2020 (reference CHE/20/00432/FUL, planning authority Chesterfield)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date20 Apr 2021 (granted, reference CHE/20/00432/FUL, planning authority Chesterfield)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLow CarbonDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity31 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area65 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.2593, -1.3340DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage is the 384th-largest of 3,430 power plants in England and the 720th-largest of 5,050 in the United Kingdom by capacity; its 31 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England384th of 3,43071,985 MW<0.1%
United Kingdom720th of 5,050115,642 MW<0.1%
All power plants in our data2,733rd of 12,0081,173,302 MW<0.1%

Nearby

Within 50 km of this power plant: 178 grid connections (100 operating, 911 MW), 155 substations, 9 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Wind 20.22 MW grid connection at Pennyhill WindfarmGrid connection20.2 MWOperating8.3 km
Kiveton ParkSubstation——9.7 km
DronfieldSubstation——9.8 km
Wind 4.5 MW grid connection at Kiveton ParkGrid connection4.5 MWOperating9.9 km
Gas 1.5 MW grid connection at BeightonGrid connection1.5 MWPlanned9.9 km
HackenthorpeSubstation——11 km
Hive ITData center——16 km
UoS IT ServicesData center——17 km
Chesterfield to WillingtonTransmission line—Planned26 km

Operator and place

More from Low Carbon

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page