Immingham Landfill Scheme
Immingham Landfill Scheme is a power plant in North East Lincolnshire, England, United Kingdom, with 1 MW of capacity, operated by Winerton Power Ltd.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | North East Lincolnshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Queens Road Immingham South Humberside | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 1999 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 2 Jun 1994 (Town and Country Planning Act, issued by North East Lincolnshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 2 Mar 1994 (North East Lincolnshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 2 Jun 1994 (granted, North East Lincolnshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Winerton Power Ltd | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 1 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Landfill Gas | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.6141, -0.1826 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Immingham Landfill Scheme is the 3,301st-largest of 3,430 power plants in England and the 4,866th-largest of 5,050 in the United Kingdom by capacity; its 1 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 3,301st of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 4,866th of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 11,790th of 12,008 | 1,173,302 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Permit issued (Town and Country Planning Act)
- Started operating
Nearby
Within 50 km of this power plant: 238 grid connections (115 operating, 1,876 MW), 107 substations, 4 transmission lines and 1 CO2 emitter, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Port of Immingham Development grid connection | Grid connection | 16.5 MW | Operating | 0.4 km |
| Waste 4 MW grid connection at Immingham Landfill Generation | Grid connection | 4 MW | Operating | 0.4 km |
| Waste 49.95 MW grid connection at Queens Road Steam Turbine Direct | Grid connection | 50 MW | Planned | 0.4 km |
| Immingham | Substation | — | — | 0.7 km |
| Queens Road | Substation | — | — | 0.9 km |
| Humber Road | Substation | — | — | 3.0 km |
| Aldbrough Hydrogen Storage | CO2 emitter | — | Planned | 23 km |
| Continental Link Multi-Purpose Interconnector | Transmission line | — | Cancelled | 26 km |
| Grimsby to Walpole | Transmission line | — | Planned | 43 km |
Operator and place
More from Winerton Power Ltd
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.