Power plant · Nuneaton and Bedworth, England, United Kingdom
Hollyhurst Farm, Mile Tree Lane - Solar Panels
Hollyhurst Farm, Mile Tree Lane - Solar Panels is a planned power plant in Nuneaton and Bedworth, England, United Kingdom, with 25.7 MW of capacity, operated by Greenfield Energy Developments Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Nuneaton and Bedworth (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Hollyhurst Farm, Mile Tree Lane, Coventry, CV2 1NU | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Planned (planning application submitted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 20 Dec 2024 (reference 40703, planning authority Rugby) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Greenfield Energy Developments Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 25.7 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 27 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.4687, -1.4478 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Hollyhurst Farm, Mile Tree Lane - Solar Panels is the 1,105th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,736th-largest of 3,222 in the United Kingdom by capacity; its 25.7 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,105th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 1,736th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 3,357th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 7 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Data center, England (OSM way 710050084) | Data center | — | — | 9.2 km |
| Santander data center, England | Data center | — | — | 20 km |
| Santander data center, England | Data center | — | — | 21 km |
| Weston Marsh to East Leicestershire | Transmission line | — | Planned | 49 km |
Operator and place
More from Greenfield Energy Developments Limited
- Thornton Battery Storage400 MW · permitted
- Mulbarton Road, Keswick - Battery Energy Storage System400 MW · planned
- Forty Acre Wood, The Street - Battery Energy Storage System300 MW
- Buildwas - Battery Energy Storage100 MW · permitted
- Grendon Road, Earls Barton - Battery Energy Storage System99.9 MW · permitted
- Butterfly Lane, Elstree BESS - Battery Energy Storage System99.9 MW · planned
- Canalside - Battery Storage System60 MW · permitted
- Far Moor - Battery Energy Storage System50 MW · planned
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.