Hollydale, Buildwas Road - Battery Storage is a permitted power plant in Shropshire, England, United Kingdom, with 40 MW of capacity, operated by Telford Four Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationShropshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Addressadjacent Hollydale, Buildwas Road, Ironbridge, TF8 7BNDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date12 Jan 2024 (permit TWC/2023/0144, Town and Country Planning Act, issued by Shropshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date1 Mar 2023 (reference TWC/2023/0144, planning authority Shropshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date12 Jan 2024 (granted, reference TWC/2023/0144, planning authority Shropshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorTelford Four Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity40 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.6386, -2.5163DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Shropshire, reference TWC/2023/0144)
  2. Permit applied for (planning authority Shropshire, reference TWC/2023/0144)

How it compares

Hollydale, Buildwas Road - Battery Storage is the 682nd-largest of 1,651 power plants planned, permitted or under construction in England and the 1,136th-largest of 2,549 in the United Kingdom by capacity; its 40 MW is <0.1% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England682nd of 1,651172,174 MW<0.1%
United Kingdom1,136th of 2,549279,978 MW<0.1%
All power plants planned, permitted or under construction in our data2,350th of 5,782643,557 MW<0.1%

Nearby

Within 50 km of this power plant: 3 transmission lines and 3 data centers, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Reinforcement to North Shropshire Electricity Distribution NetworkTransmission line—Permitted34 km
Hutchison 3GData center——34 km
EE Data CentreData center——36 km
Mid Wales Electricity Connection (N Grid)Transmission line—Cancelled41 km
Internet Central data center, EnglandData center——44 km
Green Gen Vyrnwy FranktonTransmission line—Planned47 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page