Power plant · St. Helens, England, United Kingdom

Holiday Moss Landfill Site, Reeds Brow - Battery Storage

Holiday Moss Landfill Site, Reeds Brow - Battery Storage is a permitted power plant in St. Helens, England, United Kingdom, with 3 MW of capacity, operated by Biffa Waste Services Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSt. Helens (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressHoliday Moss Landfill Site, Reeds Brow, Rainford, St Helens, WA11 8PGDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date17 Nov 2022 (permit P/2022/0627/FUL, Town and Country Planning Act, issued by St. Helens)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date6 Sept 2022 (reference P/2022/0627/FUL, planning authority St. Helens)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date17 Nov 2022 (granted, reference P/2022/0627/FUL, planning authority St. Helens)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBiffa Waste Services LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity3 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.5078, -2.7583DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Holiday Moss Landfill Site, Reeds Brow - Battery Storage is the 1,756th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,687th-largest of 3,222 in the United Kingdom by capacity; its 3 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,756th of 2,174186,088 MW<0.1%
United Kingdom2,687th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data5,853rd of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 361 grid connections (201 operating, 1,791 MW), 342 substations, 17 data centers, 4 gas storage facilities and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Pimbo Road grid connectionGrid connection21.1 MWOperating2.3 km
Paddock Road grid connectionGrid connection6.3 MWOperating2.7 km
Yew Tree Dairy grid connectionGrid connection2.48 MWPlanned2.8 km
PimboSubstation——3.2 km
UphollandSubstation——4.1 km
Orrell BSPSubstation——4.5 km
Data center, England (OSM way 1551100328)Data center——8.7 km
Iron MountainData center——13 km
Verizon WarringtonData center——14 km

Operator and place

More from Biffa Waste Services Limited

Other power plants in England

All 5809 power plants in England, United Kingdom