Power plant · West Devon, England, United Kingdom

Hillsmoor Solar Farm

Hillsmoor Solar Farm is a power plant in West Devon, England, United Kingdom, with 1.2 MW of capacity, operated by Mosscliff Environmental.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWest Devon (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressHillsmoor, Holsworthy Road, Hatherleigh, Okehampton, Devon, EX20 3LEDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2017DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date31 Oct 2014 (permit 00765/2014, Town and Country Planning Act, issued by West Devon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date27 Jun 2014 (reference 00765/2014, planning authority West Devon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date31 Oct 2014 (granted, reference 00765/2014, planning authority West Devon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorMosscliff EnvironmentalDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.2 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area2.72 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.8115, -4.0845DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Hillsmoor Solar Farm is the 3,211th-largest of 3,430 power plants in England and the 4,760th-largest of 5,050 in the United Kingdom by capacity; its 1.2 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,211th of 3,43071,985 MW<0.1%
United Kingdom4,760th of 5,050115,642 MW<0.1%
All power plants in our data11,509th of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. 00765/2014
  2. Started operating

Nearby

Within 50 km of this power plant: 191 grid connections, 1 data center and 1 mine, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.

NameKindSizeStatusDistance
Hillsmoor Solar Farm, Hatherleigh grid connectionGrid connection——0.2 km
Beaworthy Willsland Church Road Highampton grid connectionGrid connection——4.9 km
Hopkins Solar Farm grid connectionGrid connection——9.1 km
Data center, England (OSM way 164113041)Data center——34 km
Tungsten WestMine——44 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page