Hill Rise, Coleby - Battery Energy Storage is a planned power plant in North Kesteven, England, United Kingdom, with 1,000 MW of capacity, operated by Navenby Energy Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | North Kesteven (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | The S/O Hill Rise, W/O Coleby & N/O Navenby, Lincoln, LN5 0LL | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Planned (planning application submitted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 15 May 2025 (reference 25/0533/FUL, planning authority North Kesteven) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Navenby Energy Limited (applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 1,000 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.1322, -0.5415 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit applied for (planning authority North Kesteven, reference 25/0533/FUL)
How it compares
Hill Rise, Coleby - Battery Energy Storage is the 31st-largest of 1,651 power plants planned, permitted or under construction in England and the 51st-largest of 2,549 in the United Kingdom by capacity; its 1,000 MW is 0.36% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 31st of 1,651 | 172,174 MW | 0.58% |
| United Kingdom | 51st of 2,549 | 279,978 MW | 0.36% |
| All power plants planned, permitted or under construction in our data | 77th of 5,782 | 643,557 MW | 0.16% |
Nearby
Within 50 km of this power plant: 34 grid connections (18 operating, 246 MW), 25 substations, 5 transmission lines and 3 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Digital Space DC - Newark | Data center | — | — | 18 km |
| Hall Water Treatment Works grid connection | Grid connection | 1.6 MW | Operating | 20 km |
| Newton on Trent Water Works grid connection | Grid connection | 3.1 MW | Operating | 21 km |
| Stow | Substation | — | — | 23 km |
| Stow Park Road grid connection | Grid connection | 1.19 MW | Operating | 24 km |
| Normanby | Substation | — | — | 28 km |
| Harpswell | Substation | — | — | 30 km |
| Triton Knoll Electrical System | Transmission line | — | Permitted | 31 km |
| Eastern Green Link 3 and Eastern Green Link 4 | Transmission line | — | Planned | 36 km |
Operator and place
More from Navenby Energy Limited
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
- Navitus Bay Wind Park970 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.