Power plant · Halton, England, United Kingdom

Hedco, Desoto Road - Solar panels

Hedco, Desoto Road - Solar panels is a permitted solar power plant in Halton, England, United Kingdom, with 3.5 MW of capacity, operated by PSD Construct Limtied.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHalton (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressHedco Desoto Road Widnes, WA8 0PBDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date14 Jun 2024 (permit 22/00276/FUL, Town and Country Planning Act, issued by Halton)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date27 May 2022 (reference 22/00276/FUL, planning authority Halton)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date14 Jun 2024 (granted, reference 22/00276/FUL, planning authority Halton)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPSD Construct Limtied (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity3.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area5.9 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.3533, -2.7440DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Halton, reference 22/00276/FUL)
  2. Permit applied for (planning authority Halton, reference 22/00276/FUL)

How it compares

Hedco, Desoto Road - Solar panels is the 1,358th-largest of 1,650 power plants planned, permitted or under construction in England and the 2,164th-largest of 2,548 in the United Kingdom by capacity; its 3.5 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,358th of 1,650171,264 MW<0.1%
United Kingdom2,164th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data5,340th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 294 substations, 291 grid connections (162 operating, 1,445 MW), 17 data centers and 3 gas storage facilities, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
The Babbage CentreData center——3.5 km
Bold GSPSubstation——9.7 km
Iron MountainData center——10 km
Verizon WarringtonData center——12 km
Unit 1 Junction Lane grid connectionGrid connection5.26 MWPlanned13 km
Newton Le WillowsSubstation——14 km
Parkside Railway Station grid connectionGrid connection3 MWOperating14 km
Lymes Wood Landfill Site grid connectionGrid connection1.17 MWOperating14 km
HaydockSubstation——15 km