Power plant · Newark and Sherwood, England, United Kingdom
Hawton Wind Farm
Hawton Wind Farm is a power plant in Newark and Sherwood, England, United Kingdom, with 9 MW of capacity, operated by Temporis Capital.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Newark and Sherwood (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Cotham Road, Hawton, Nottinghamshire, NG24 3SD | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2017 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 29 Sept 2014 (permit 11/01588/FULM, Town and Country Planning Act, issued by Newark and Sherwood) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 5 Dec 2011 (reference 11/01588/FULM, planning authority Newark and Sherwood) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 29 Sept 2014 (granted, reference 11/01588/FULM, planning authority Newark and Sherwood) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 29 Sept 2014 (appeal granted, reference 11/01588/FULM, planning authority Newark and Sherwood) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 22 Aug 2012 (refused, reference 11/01588/FULM, planning authority Newark and Sherwood) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Temporis Capital | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 9 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Units | 3 units (2.5 MW per unit) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Wind Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.0489, -0.8110 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Hawton Wind Farm is the 1,248th-largest of 3,430 power plants in England and the 2,052nd-largest of 5,050 in the United Kingdom by capacity; its 9 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,248th of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 2,052nd of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 7,421st of 12,008 | 1,173,302 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Permit issued (Town and Country Planning Act), no. 11/01588/FULM
- Started operating
Nearby
Within 50 km of this power plant: 340 grid connections (18 operating, 176 MW), 16 substations, 5 transmission lines and 3 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Newark Energy Storage Plant grid connection | Grid connection | — | — | 0.5 km |
| Sovereign Property Partners LLP Stor Site grid connection | Grid connection | — | — | 0.6 km |
| Newark Power Generation Plant, Bowbridge Lane, Balderton, Newark grid connection | Grid connection | — | — | 0.6 km |
| Digital Space DC - Newark | Data center | — | — | 3.6 km |
| nLighten Nottingham | Data center | — | — | 27 km |
| Experian | Data center | — | — | 29 km |
| Weston Marsh to East Leicestershire | Transmission line | — | Planned | 30 km |
| Stow | Substation | — | — | 31 km |
| Lea Road | Substation | — | — | 38 km |
Operator and place
More from Temporis Capital
- Tullymurdoch Wind Farm14.4 MW
- Upper Holton Wind Farm11.5 MW
- Land West Of Sookholme Road10 MW
- Chainbridge Road8 MW
- Dunsland Cross Wind Farm7.5 MW
- Craig Wind Farm (Extension)2.5 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.