Power plant · Lichfield, England, United Kingdom

Hawkesyard Estate, Rugeley Road - Battery Energy Storage

Hawkesyard Estate, Rugeley Road - Battery Energy Storage is a planned battery storage plant in Lichfield, England, United Kingdom, with 100 MW of capacity, operated by GSC Hawkesyard Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationLichfield (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand Adj Hawkesyard Estate Rugeley Road, WS15 1PUDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date16 Oct 2025 (reference 25/01221/FULM, planning authority Lichfield)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGSC Hawkesyard Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity100 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.7452, -1.8999DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Lichfield, reference 25/01221/FULM)

How it compares

Hawkesyard Estate, Rugeley Road - Battery Energy Storage is the 234th-largest of 1,650 power plants planned, permitted or under construction in England and the 401st-largest of 2,548 in the United Kingdom by capacity; its 100 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England234th of 1,650171,264 MW<0.1%
United Kingdom401st of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data1,267th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 6 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
Hutchison 3GData center——24 km
EE Data CentreData center——25 km
Internet Central data center, EnglandData center——38 km
Chesterfield to WillingtonTransmission line—Planned44 km

Operator and place