Power plant · Cumberland, England, United Kingdom
Haverigg Repowering (Haverigg II) Wind Farm
Haverigg Repowering (Haverigg II) Wind Farm is a wind power plant in Cumberland, England, United Kingdom, with 1.2 MW of capacity, operated by Windprospect.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Cumberland (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Kirksanton Airfield Part of Hemplands Farm Haverigg Millom Cumbria | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2004 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 15 Aug 2002 (permit 4/02/0505/0, Town and Country Planning Act, issued by Cumberland) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 29 Apr 2002 (reference 4/02/0505/0, planning authority Cumberland) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 15 Aug 2002 (granted, reference 4/02/0505/0, planning authority Cumberland) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Windprospect | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 1.2 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Units | 5 units (0.22 MW per unit) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Wind Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 54.2050, -3.3219 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Commissioned
- Permit granted (planning authority Cumberland, reference 4/02/0505/0)
- Permit applied for (planning authority Cumberland, reference 4/02/0505/0)
How it compares
Haverigg Repowering (Haverigg II) is the 3,776th-largest of 4,036 power plants in England and the 5,495th-largest of 5,837 in the United Kingdom by capacity; its 1.2 MW is <0.1% of the 200,833 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 3,776th of 4,036 | 134,406 MW | <0.1% |
| United Kingdom | 5,495th of 5,837 | 200,833 MW | <0.1% |
| All power plants in our data | 12,477th of 13,028 | 1,354,089 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Started operating
Nearby
Within 50 km of this power plant: 121 grid connections (69 operating, 1,046 MW), 66 substations and 1 gas storage facility, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Haverigg Wind Farm grid connection | Grid connection | 1.7 MW | Operating | 0.5 km |
| Haverigg Wind Farm grid connection | Grid connection | 1.7 MW | Operating | 0.5 km |
| Thornton Waste Technology Park, Fleetwood Road North grid connection | Grid connection | 1.25 MW | Operating | 0.7 km |
| Askam | Substation | — | — | 8.0 km |
| Bowaters | Substation | — | — | 9.1 km |
| Barrow | Substation | — | — | 11 km |
| Preesall Saltfield Underground Gas Storage | Gas storage facility | — | Cancelled | 40 km |
Operator and place
More from Windprospect
- Fairfield Farm7.8 MW
- Fairfield Farm6.5 MW
- Oldside Wind Farm5.4 MW
- Lowca Wind Farm4.7 MW
- Siddick Wind Farm4.2 MW
- Drigg Wind Cluster3 MW
Other power plants in England
- Drax Power Station Biomass Units2,580 MW
- Ratcliffe-on-Soar2,021 MW
- Cottam2,000 MW
- Walpole Flexible Generation Project2,000 MW
- West Burton2,000 MW
- Eggborough1,960 MW
- Staythorpe1,828 MW
- Fiddler’s Ferry1,510 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DUKES 5.11: Power stations in the United Kingdom, Open Government Licence v3.0.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.