Power plant · North Warwickshire, England, United Kingdom
Hams Hall, Hams Lane - Battery Energy Storage System
Hams Hall, Hams Lane - Battery Energy Storage System is a permitted battery storage plant in North Warwickshire, England, United Kingdom, with 98 MW of capacity, operated by Eon UK Plc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | North Warwickshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | 290 Metres E/O Hams Hall Electricity Sub Station, Hams Lane, Lea Marston, Sutton Coldfield, B76 0BY | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 17 Oct 2025 (permit PAP/2025/0227, Town and Country Planning Act, issued by North Warwickshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 20 May 2025 (reference PAP/2025/0227, planning authority North Warwickshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 17 Oct 2025 (granted, reference PAP/2025/0227, planning authority North Warwickshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Eon UK Plc (applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 98 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.5473, -1.6998 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority North Warwickshire, reference PAP/2025/0227)
- Permit applied for (planning authority North Warwickshire, reference PAP/2025/0227)
How it compares
Hams Hall, Hams Lane - Battery Energy Storage System is the 298th-largest of 1,650 power plants planned, permitted or under construction in England and the 491st-largest of 2,548 in the United Kingdom by capacity; its 98 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 298th of 1,650 | 171,264 MW | <0.1% |
| United Kingdom | 491st of 2,548 | 279,068 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,422nd of 5,799 | 657,076 MW | <0.1% |
Nearby
Within 50 km of this power plant: 7 data centers, measured from the coordinates in the facts above. The table shows the nearest 3.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Data center, England (OSM way 710050084) | Data center | — | — | 22 km |
| EE Data Centre | Data center | — | — | 22 km |
| Hutchison 3G | Data center | — | — | 22 km |
Operator and place
More from Eon UK Plc
- Lentons Lane, Aldermans Green - Solar Panels25 MW
- Lentons Lane - Solar Panels25 MW · permitted
- Huskisson Dock Building, Huskisson Dock - Solar PV Array1.46 MW · permitted
Other power plants in England
- Drax Power Station Biomass Units2,580 MW
- Ratcliffe-on-Soar2,021 MW
- Cottam2,000 MW
- Walpole Flexible Generation Project2,000 MW
- West Burton2,000 MW
- Eggborough1,960 MW
- Staythorpe1,828 MW
- Fiddler’s Ferry1,510 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- Wikidata. Wikidata, CC0 1.0.