Power plant · North East Lincolnshire, England, United Kingdom

Grimsby Solar Farm

Grimsby Solar Farm is a power plant under construction in North East Lincolnshire, England, United Kingdom, with 49.9 MW of capacity, operated by Aura Power.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth East Lincolnshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressFields Off, Aylesby Lane, Healing, Grimsby, Humberside, DN41 7QPDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date25 Nov 2022 (permit DM/0899/21/FUL, Town and Country Planning Act, issued by North East Lincolnshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date7 Oct 2021 (ref. DM/0899/21/FUL, North East Lincolnshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date25 Nov 2022 (granted, ref. DM/0899/21/FUL, North East Lincolnshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorAura PowerDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area134 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.5611, -0.1701DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Grimsby Solar Farm is the 514th-largest of 2,174 power plants planned, permitted or under construction in England and the 886th-largest of 3,222 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England514th of 2,174186,088 MW<0.1%
United Kingdom886th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data1,966th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 240 grid connections (109 operating, 1,735 MW), 102 substations, 4 transmission lines and 1 CO2 emitter, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Solar 49 MW grid connection at Great Coates PV DirectGrid connection49 MWPlanned1.1 km
Solar 50 MW grid connection at Grimsby Solar DirectGrid connection50 MWOperating1.1 km
Wind 1.378 MW grid connection at ScarthoGrid connection1.38 MWOperating1.1 km
Grimsby WestSubstation——1.4 km
Great CoatesSubstation——3.2 km
Yarborough Road 132/33kVSubstation——4.1 km
Aldbrough Hydrogen StorageCO2 emitter—Planned28 km
Continental Link Multi-Purpose InterconnectorTransmission line—Cancelled31 km
Grimsby to WalpoleTransmission line—Planned38 km

Operator and place

More from Aura Power

Other power plants in England

All 5809 power plants in England, United Kingdom