Power plant · Chorley, England, United Kingdom

Green Energy Park, Eyes Lane - Solar panels

Green Energy Park, Eyes Lane - Solar panels is a planned power plant in Chorley, England, United Kingdom, with 12 MW of capacity, operated by GA Pet Food Partners Group Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationChorley (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressGreen Energy Park, Asland Walks Eyes Lane, Bretherton, Chorley, PR6 6FSDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date14 Jan 2026 (reference 25/01256/FULMAJ, planning authority Chorley)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGA Pet Food Partners Group LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity12 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar Photovoltaics (co-located with re)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area39.7 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.6541, -2.6224DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Chorley, reference 25/01256/FULMAJ)

How it compares

Green Energy Park, Eyes Lane - Solar panels is the 1,412th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,193rd-largest of 3,222 in the United Kingdom by capacity; its 12 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,412th of 2,174185,888 MW<0.1%
United Kingdom2,193rd of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data4,951st of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 404 grid connections (222 operating, 1,894 MW), 373 substations, 19 data centers, 3 gas storage facilities and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Chorley SouthSubstation——0.6 km
Woodfield RDSubstation——0.7 km
Botany BaySubstation——1.4 km
Clayton Hall Quarry grid connectionGrid connection1.43 MWOperating4.7 km
Waitrose Leyland RDC grid connectionGrid connection2 MWPlanned4.8 km
Charnock Richard grid connectionGrid connection25 MWPlanned4.9 km
Data center, England (OSM way 1551100328)Data center——20 km
Verizon WarringtonData center——26 km
East Irish Sea Transmission ProjectTransmission line—Planned26 km

Operator and place

More from GA Pet Food Partners Group Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page