Power plant · Rushcliffe, England, United Kingdom

Gotham - Battery Energy storage

Gotham - Battery Energy storage is a planned power plant in Rushcliffe, England, United Kingdom, with 100 MW of capacity, operated by Net Zero Energy Development Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationRushcliffe (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressBarton-in-Fabis Nottingham Road Gotham, NG11 0HADESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date2 May 2024 (reference 24/00537/FUL, planning authority Rushcliffe)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNet Zero Energy Development LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity100 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.8734, -1.1995DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Rushcliffe, reference 24/00537/FUL)

How it compares

Gotham - Battery Energy storage is the 248th-largest of 2,174 power plants planned, permitted or under construction in England and the 426th-largest of 3,222 in the United Kingdom by capacity; its 100 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England248th of 2,174185,888 MW<0.1%
United Kingdom426th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data1,276th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 6 data centers, 2 transmission lines and 1 grid connection (20.2 MW), measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
ExperianData center——3.7 km
nLighten NottinghamData center——15 km
Weston Marsh to East LeicestershireTransmission line—Planned19 km
Chesterfield to WillingtonTransmission line—Planned24 km
Santander data center, EnglandData center——32 km
Wind 20.22 MW grid connection at Pennyhill WindfarmGrid connection20.2 MWOperating50 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom