Power plant · Wychavon, England, United Kingdom

Glebe Farm Solar Farm

Glebe Farm Solar Farm is a power plant in Wychavon, England, United Kingdom, with 32 MW of capacity, operated by NextEnergy Capital LLP.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWychavon (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressGlebe Farm, Bourne Road, Defford, Worcester, WR8 9BTDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2021DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date21 Oct 2015 (permit 15/01323, Town and Country Planning Act, issued by Wychavon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date21 May 2015 (reference 15/01323, planning authority Wychavon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date21 Oct 2015 (granted, reference 15/01323, planning authority Wychavon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNextEnergy Capital LLPDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity32 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area39.1 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.0697, -2.1470DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Wychavon, reference 15/01323)
  3. Permit applied for (planning authority Wychavon, reference 15/01323)

How it compares

Glebe Farm Solar Farm is the 371st-largest of 3,430 power plants in England and the 701st-largest of 5,050 in the United Kingdom by capacity; its 32 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England371st of 3,43071,965 MW<0.1%
United Kingdom701st of 5,050115,622 MW<0.1%
All power plants in our data2,696th of 12,0321,190,447 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 13 substations, 11 grid connections (6 operating, 122 MW) and 3 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Ionos data center, EnglandData center——15 km
Shipton Oliffe PrimarySubstation——26 km
DXC TechnologyData center——32 km
Evoque Data Center SolutionsData center——32 km
Northleach PrimarySubstation——34 km
Rissington PrimarySubstation——36 km
Bathurst Estates grid connectionGrid connection49.9 MWOperating41 km
Cirencester Solar Park grid connectionGrid connection25 MWPlanned41 km
Crucis Park Estate LLP grid connectionGrid connection12.6 MWPlanned42 km

Operator and place

More from NextEnergy Capital LLP

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page