Power plant · West Northamptonshire, England, United Kingdom

Glassthorpe Hill, Flore - Solar Farm

Glassthorpe Hill, Flore - Solar Farm is a planned solar power plant in West Northamptonshire, England, United Kingdom, with 49.9 MW of capacity, operated by EDF Renewables.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWest Northamptonshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressGlassthorpe Hill & Land Off Brington Road, Flore, NN7 4NQDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date20 Apr 2022 (reference WND/2022/0410, planning authority West Northamptonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEDF Renewables (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area96.9 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.2481, -1.0438DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority West Northamptonshire, reference WND/2022/0410)

How it compares

Glassthorpe Hill, Flore - Solar Farm is the 455th-largest of 1,651 power plants planned, permitted or under construction in England and the 801st-largest of 2,549 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England455th of 1,651172,174 MW<0.1%
United Kingdom801st of 2,549279,978 MW<0.1%
All power plants planned, permitted or under construction in our data1,881st of 5,782643,557 MW<0.1%

Nearby

Within 50 km of this power plant: 24 grid connections (12 operating, 98.1 MW), 11 substations and 9 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Hellermann Tyton DataData center——8.6 km
nLighten Milton KeynesData center——28 km
Data center, England (OSM way 460010263)Data center——29 km
Cottisford PrimarySubstation——31 km
Shelswell Solar Park grid connectionGrid connection4.75 MWOperating31 km
Tritax Symmetry Park grid connectionGrid connection15 MWPlanned34 km
Pembridge Farm grid connectionGrid connection131 MWPlanned36 km
Deddington PrimarySubstation——36 km
East Claydon GSPSubstation——37 km

Operator and place

More from EDF Renewables

Other power plants in England

All 5876 power plants in England, United Kingdom

Data on this page